 |
 |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Search
|
| |
 |
|
 |
|
| |
01/08/05
Started
on the HS Front Spar - Clecoed the HS714 and
the correct HS710 to the front spar channels (HS702)
in preparation for drilling.
|
|
|
|
|
|
|
| |
|
01/08/05
Started
on the HS Front Spar -
Full view of the front spar channels (HS702)
clecoed together on the workbench.
|
|
|
|
|
|
|
|
|
|
01/08/05
Started
on the HS Front Spar - Match
drilled to #30 all holes inboard of where the
HS404 and HS405 ribs attach to the front spar.
|
|
|
|
|
|
|
|
| |
|
01/08/05
Started
on the HS Front Spar - HS710
and HS714 removed from the front spar channels
and marked for tapering.
|
|
|
|
|
|
|
|
| |
|
01/08/05
Started
on the HS Front Spar - Tapered
HS710 and HS714. They are now ready for edge
finishing and bending.
|
|
|
|
|
|
|
|
| |
|
01/08/05
Started
on the HS Front Spar - I
bought some aluminum angle from Lowes and cut
a couple of pieces the length of my vise. I
used the scotch brite wheel to put a 1/8" radius
on the edge of the angle in preparation for
bending the HS710 and HS714. I plan on leaving
this angle on the vise, so I glued them on
with some space age glue I got at OSHKOSH.
We will see how long it holds.
|
|
|
|
|
|
| |
|
|
|
|