Texas A&M University Website Texas A&M University Website

Home
Tools
Preparation
Practice Kit
Empennage
Wings
Fuselage
Finishing Kit
Electrical
Avionics
Engine
Links
OSHKOSH
My Support Team
Email Me
Search
 
God Bless America
DON'T Mess with TEXAS
 

11/20/04

Inventoried My Empennage Kit - I spent about 3.5 hours opening all of the small brown paper bags containing the hardware for the kit and putting the labels on the storage bins. There were alot of bags, but it was cool going through all of the stuff. I spent another 1.5 hours inventorying the rest of the kit. More pictures to follow.

NEXT

 

11/20/04

Inventoried My Empennage Kit -The portion of the kit you see here is in the dining room warehouse. I don't like the wallpaper, so I will be moving the stuff soon :-). This is not all of the small parts from the kit, but it is 90% of them. I didn't take pictures of everything in the interest of time.

PREVIOUS

NEXT

11/20/04

Inventoried My Empennage Kit -This is the vertical stabilizer skin on top of the largest box that the kit came in. That little piece next to it is a complementary bolt size gauge from Van's. They are housed in the living room warehouse.

PREVIOUS

NEXT

 

11/20/04

Inventoried My Empennage Kit -These are the horizontal stabilizer skins (right x 2) and the elevator skins (left x 2). I didn't take pictures of the rudder skins (they are in the large box), but they are big. This baby is going to have some serious rudder authority!!

PREVIOUS

BACK