6/22/06
Left
Side Tie Down Bracket Work - Marked
the aluminum stock for the W726L tie down spacers.
Centerpunched
center of hole, drilled to #40, 1/4", and to 3/16".
|
|
|
|
|
|
|
| |
|
6/22/06
Left
Side Tie Down Bracket Work -
Packed the unibit with Boelube to drill
W726L spacer holes to final size. I didn't have a
unibit that went up to 1" so I only went to 3/4".
The 1" unibit is almost $60.
|
|
|
|
|
|
|
|
|
|
6/22/06
Left
Side Tie Down Bracket Work - Drilled
holes to final size.
|
|
|
|
|
|
|
|
| |
|
6/22/06
Left
Side Tie Down Bracket Work - Use
the band saw to cut the spacers off of the
stock.
|
|
|
|
|
|
|
|
| |
|
6/22/06
Left
Side Tie Down Bracket Work - Deburred
and edge prepped all edges and here is
the finished product.
|
|
|
|
|
|
|
|
| |
|
6/22/06
Left
Side Tie Down Bracket Work - Marked W731L and drilled
the match locating hole.
|
|
|
|
|
|
| |
|
|
|
|