6/24/06
Right
& Left Main Spar Work - Clecoed all of
the nutplates on the top flange of W706R.
|
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work -
Remove one cleco and insert a rivet in each
hole. Putting both clecoes in first lines up the
nutplates for riveting. Squeeze the first rivet,
remove the remaining clecos, squeeze the second rivet.
|
|
|
|
|
|
|
|
|
|
6/24/06
Right & Left
Main Spar Work - Here
is a shot with the first rivet squeezed
and the second inserted and ready to squeeze.
|
|
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work - All
nutplates installed for tank and inspection
cover attach on W706R.
|
|
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work - Clecoed
the 2 K1000-4 nutplates on W706R web.
|
|
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work - Shot
from the back side of the two K1000-4
nutplates.
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work - Rivets installed and squeezed.
|
|
|
|
|
|
|
|
6/24/06
Right & Left
Main Spar Work - W706R
K1000-4 nutplates installed.
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work - Clecoed
nutplates on the top flange of W706L.
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work - Remove
one cleco from each nutplate and install
the rivet.
|
|
|
|
|
|
| |
|
6/24/06
Right & Left
Main Spar Work - Finished
installing nutplates on top flange of
W706L and the tank attach nutplates on
the bottom flange of W706L.
Clecoed on the inspection cover nutplates
for riveting.
|
|
|
|
|
|
|
|
6/24/06
Right & Left
Main Spar Work - All
tank and inspection cover attach nutplates
installed on W706L.
Two K1000-4 nutplates installed on the
W706L web (not shown).
|
|
|
|
|
| |
|
|
|
|