3/19/05
Bought Another RV-7 Project with Empennage and Wing Kit - My Dad called me and told me about an auction he saw on e-Bay for an RV-7 project. The sale included an empennage kit that was about 85% complete and a wing kit that was untouched with the exception of un-crating. The guy who was selling it lived in Latrobe, PA and there were several inquiries regarding the sale, but he was not willing to crate it back up to ship it. If you bought it you had to go pick it up. The minimum opening bid was $3999.99 and the project had been on aution for 15.5 days out of a 16 day auction with no bids. Latrobe, PA is only about 4.5 hours from Easton, PA but I had to clear it with the wife. I called her and got her voice mail, but I proceeded to tell her about it and at the end of the message I said...oh by the way...I just clicked the button to place the bid so call me if you don't want me to buy it :-). As it turned out I was the only bidder at $3999.99 so I had to buy it even if the wife said no. I had to do some fast talking, so I pulled a page from her book and used the "guess how much I saved" tactic. I didn't get in too much trouble since I got a good deal. Wing kits were going for $5800 at the time and it cost me about $300 to go pick it up and bring it back. When I got the stuff back home I inventoried it and the only thing missing was a 1 foot $1.98 piece of aluminum tubing. I have my wings!  
   
 

3/19/05

Bought Another RV-7 Project with Empennage and Wing Kit - I didn't take pictures of all of the stuff I bought, but here is a picture of the main spar center section (yellow anodized parts), the wing ribs, some rear wing spars, the wing tip lens covers, and the landing lights (boxes lower right). The only airframe parts that are anodized are the main spars and the main spar center section (the part the wings bolt to). This is for long term corrosion protection, but it reduces the life of the wing spars by about half. This drops the useful life down to about 20,000 hours.

NEXT

3/19/05

Bought Another RV-7 Project with Empennage and Wing Kit - Here is a picture of the main spars and the wing skins.

PREVIOUS

NEXT

 

3/19/05

Bought Another RV-7 Project with Empennage and Wing Kit - Another picture of the main spars and the wing skins.

PREVIOUS

NEXT

     

3/19/05

Bought Another RV-7 Project with Empennage and Wing Kit - The wings come with a hundred little brown lunch bags full of parts...literally. The two gray storage bins have all of the small pieces and parts that come with the wing kit. The blue ones have the stuff for my empennage kit.

PREVIOUS

NEXT

 
     
 

3/19/05

Bought Another RV-7 Project with Empennage and Wing Kit - Nothing special to show here, just a wide shot of my drawing set up. I didn't mention it before, but I am going to use my empennage kit for my "first" plane. When I purchased the other project, I re-registered the kit in my name, so now I can build two ;-).

PREVIOUS